numerals Eval#3 Week#12

by Logan

week
gsoc
gsoc2020
numerals
eval#3
week#12

Week Summary

Final round of code cleaning and stability improvements before submission. Update build scripts to use a fixed version of alpine linux in case :latest release breaks something in the future. Make build scripts generate all data before first launch, so there is no need for manual intervention during the install. Zip data for smaller docker images, and host final version of the images on the gitlab docker registry.

Continued UI improvements to improve readability of figures. Added user guide, updated installation instructions and readme in preparation for submission.

Daily Work Update

# Day Date A short description of the work done
1 Monday 2020/06/01 Switch to fixed version of alpine linux for docker builds, to ensure forward compatibility. Remove manual intervention during build. UI fixes: loading div location and better word wrap.
2 Tuesday 2020/06/02 Remove unused code. Zip data to save space and add build script to generate data for every Sumerian text in the database. Remove data in old format and scripts for working with old format. Remove debug messages from final JS scripts. UI improvements: change range of similar items histogram, show units in concordance table, show loading indicator in radio button click, always collapse autocomplete div on search, wider graph edges for easier readability. Data changes: whitelist masz, require full word matches when filtering data. Add user guide. Warn about browser compatibility in welcome modal.
3 Wednesday 2020/06/03 Make commodity-viz a submodule and copy changes from framework repo back to original github repo. Link to user guide from main README. Update default parameters to sensible values. Finalize build scripts and upload images to docker registry. Fork on cdli-gh.
4 Thursday 2020/06/04
5 Friday 2020/06/05
6 Saturday 2020/06/06
7 Sunday 2020/06/07