This week focused on the Week 1 foundation for scalable email infrastructure. I added the initial email_jobs database structure, CakePHP model files, validation, and basic tests. No current email flow was changed yet.
| # | Day | Date | A short description of the work done |
|---|---|---|---|
| 1 | Monday | 2026/05/25 | Reviewed current email flow and finalized Week 1 scope. |
| 2 | Tuesday | 2026/05/26 | Created the email_jobs migration with status, retry, and timestamp fields. |
| 3 | Wednesday | 2026/05/27 | Added EmailJob entity and EmailJobsTable validation. |
| 4 | Thursday | 2026/05/28 | Added model tests for email jobs. |
| 5 | Friday | 2026/05/29 | Checked file structure |
| 6 | Saturday | 2026/05/30 | |
| 7 | Sunday | 2026/05/31 |